Tiverton Road

Structural Design, New Build, SUDS Strategy

Two new three-bedroom houses are taking shape in Queen’s Park, with our team providing the structural design. From the outset, we prepared a sustainable drainage (SuDS) strategy that was approved at planning with no comments from the Lead Local Flood Authority.

The site comes with its challenges, bordered by a Network Rail line, significant tree constraints and a tall retaining wall. This means we’ve worked closely with the client’s chosen contractor to shape the design around the build sequence and make delivery straightforward.

Project Team

Architecture: Dowen Farmer Architects


0207 458 4957
info@articulateengineering.com

Unit 301, Leroy House
434-436 Essex Road
N1 3QP

Follow Us

Chartered Practice

2025 © Articulate Engineering Limited  |  Privacy Policy & Cookies
Created By Made Studios

0207 458 4957
info@articulateengineering.com
Subscribe to our Newsletter

Unit 301, Leroy House
434-436 Essex Road
N1 3QP

Follow Us

Chartered Practice

2025 © Articulate Engineering Limited
Privacy Policy & Cookies
Created By Made Studios